New Construction, will be completed in March 2026. Pictures are of an existing house of the same model. Sign a contract now, and you can pick the colors and finishes. The split floor plan includes stacked washer/dryer, large exterior storage closet, two tone exterior paint, ceiling fans in all bedrooms, living room and master bathroom, stainless steel kitchen appliances, including side by side refrigerator with ice and cold water dispenser. Pictures are of houses previously built by KSR Contracting LLC.